We provide a full design services by
following industry standards & phases of design.
step 1-
Pre-Design including:
data collecting and programming,
zoning and code analysis,
site analysis,
existing conditions review,
feasibility consulting
step 2
Schematic Design including:
design approach
budgeting
planning review
project evaluation
material selection
step 3
Design Development:
design refinement
consultants coordination
product sourcing
step 4
Construction documents including:
detailing
construction drawings
specifications
project consultants coordination
contractor coordination
step 5 (optional)
Contract administration:
permit expediting
bidding
shop drawings review
consultant coordination
bid review
payout review
step 6 (optional)
Post construction:
field project documentation
post construction services
Design Process and Project Compensation
Design Process and Project Delivery
DESIGN COMPENSATION AND DESIGN TIME
New Design: Price is based on industry standards.
Full architectural 4%; architectural engineering (MEP) 4% of construction value...
Dwellings, Single Family (Tract)
Typical construction cost range: $90 to $190
Average cost: $115 sq. ft. (not including site work)
Average floor area: 2,300 sq. ft.
Average total time for design: 23 hours
Average total design time per 1,000 sq. ft: 10 hours
53% of project charges at lump sum
32% charges at hourly rates or hourly cost-plus profit
6% charges at percentage of construction
Family Restaurant Family Restaurant Dinning Original building has been erected back 1958 as a small restaurant to fill up a local needs, since than many small updated has been provided by a different owners. In 2007 existing interior and exterior building has been redesign and rebuild by our crew serving local communities as a great place to visit and spend quality family time. (Mabenka restaurant, 7902 S. Cicero Ave. Burbank IL)
Dwellings, Single Family (Developer, Luxury)
Typical construction cost range: $180 to $230
Average cost: $140 sq. ft. (not including site work)
Average floor area: 3,800 sq. ft.
Average total time for design: 45 hours
Average total design time per 1,000 sq. ft: 11.9 hours
51% of project charges at lump sum
36% charges at hourly rates or hourly cost plus profit
7% charges at percentage of construction
Dwellings, Single Family (Custom, Luxury)
Typical construction cost range: $190 to $350
Average cost: $200 sq. ft. (not including site work)
Average floor area: 4,300 sq. ft.
Average total time for design: 155 hours
Average total design time per 1,000 sq. ft: 36.0 hours
48% of project charges at lump sum
39% charges at hourly rates or hourly cost plus profit
7% charges at percentage of construction
Commercial Buildings /Banks, Savings and Loans
Typical construction cost range: $98 to $195
Average cost: $278 sq. ft. (not including site work)
Average floor area: 8,560 sq. ft.
Average total time for design: 348 hours
Average total design time per 1,000 sq. ft: 40.7 hours
Average time Pre-design and Site Analysis: 96 hours
Average time for Schematics and Design Development: 252 hours
Office Building
Low-Rise/Mid-Rise
Typical construction cost range: $120 to $195
Average floor area: 49,900 sq. ft.
Average total time for design: 528 hours
Average total design time per 1,000 sq. ft: 10.6 hours
Average time Predesign and Site Analysis: 150 hours
Average time for Schematics and Design Development: 378 hours